Open Standard · M2 Planning & Scheduling
M2.1 Planning & Schedule Development
Knowledge
Articles and chapters
- M2.5 — Schedule Forecasting & Analysis21 Oct 2026
By the end of this section, the learner should be able to take a credible current schedule and use it to forecast likely future outcomes, explain what is driving those outcomes, test alternative scenarios, assess the effect of uncertainty and management interventions.
- M2.4 — Progress Updating & Schedule Control21 Oct 2026
1. Practical outcomeBy the end of this section, the learner should be able to take an approved schedule and turn it into a trustworthy current control model at each reporting cycle. They should be able to establish a clear data date, collect and validate actual progress, record actual starts and acomplishments.
- M2.3 — Resources, Productivity & Schedule Optimisation21 Oct 2026
By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.
- M2.2 — Logic, Critical Path & Float21 Oct 2026
The learner should be able to construct and analyse a logically linked schedule, choose relationships, recognise missing or inappropriate logic, distinguish logic from constraints, identify critical and near-critical paths, understand total and free float, recognise negative or unusually high float.
- M2.1 — Planning & Schedule Development21 Oct 2026
By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, and over what durations and calendars etc.
- M1.5 — Data Quality, Integration & Traceability21 Oct 2026
By the end of this section, the learner should be able to establish and operate a project-controls data environment in which important information is complete enough, accurate enough, timely enough, consistent enough and traceable enough to support management decisions.
- M1.4 — Progress Measurement21 Oct 2026
By the end of this section, the learner should be able to design, apply and challenge progress-measurement rules that convert evidence of completed work into a credible statement of physical accomplishment. They should be able to choose an appropriate measurement method.
- M1.3 — Integrated Baselines21 Oct 2026
By the end of this section, the practitioner should be able to establish, test and explain an integrated project baseline that brings authorised scope, schedule, budget, assumptions, progress rules and accountability into one coherent reference position.
- M1.2 — Coding & Control Structures21 Oct 2026
By the end of this section, the practitioner should be able to design and apply a coherent set of coding and control structures that allows project information to be organised, integrated, aggregated, reconciled and reported without repeatedly rebuilding the underlying data.
- M1.1 — Scope & Work Breakdown Structures21 Oct 2026
By the end of this section, the practitioner should be able to take an authorised project scope and turn it into a Work Breakdown Structure.
Discussions
16,275 discussions
- 10repliesPrinting the Resource Usage SpreadsheetOracle Primavera - PM6by Tim Breeding· 6 years ago
- 10repliesPrimavera Baseline - Even Without It, Data is There, howcome?Oracle Primavera - PM6by Troon Sigma· 6 years ago
- 10repliesRe-Baseline with actual progressPlanning, Scheduling & Programming Discussionby Abderrahim OUBDI· 6 years ago
- 10repliesResource Assignment Dates not equal to Activity DatesOracle Primavera - PM6by Peter Bennetts· 6 years ago
- 10repliesRemaining Late Units is showing before Data Date & after completion of the Project...why ?Oracle Primavera - PM6by Irfan Khan· 6 years ago
- 10repliesImport form excell, WBS lostOracle Primavera - PM6by Santhosh kumar Narayanan· 7 years ago
- 10repliesP6 R17 licensesOracle Primavera - PM6by Alexandre Faulx-Briole· 7 years ago
- 10repliesChanging Resource TypeOracle Primavera - PM6by Matt Rudge· 7 years ago
- 10repliesLevelling Resource Hours only on 1 ActivityOracle Primavera - PM6by Christine Schwartz· 7 years ago
- 10repliesFloat not reflecting progress updates accurately.Planning, Scheduling & Programming Discussionby Jacoby Kellogg· 7 years ago
1,271–1,280 of 16,275
Blogs
Thought leadership
- How Project Planners Should Deal with a Difficult Client PMO17 Oct 2026
Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…
Sunchana Johnston
- PROCEDURES No 16 – Quality Standards23 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Sunchana’s P6 Lancelot Meets OPC Star Wars10 Aug 2026
Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…
Sunchana Johnston
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!20 Jul 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Programme Planning Standards: The Rules of the Game5 Jul 2026
Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…
Sunchana Johnston
Jobs
Roles asking for this
- ManchesterPermanent EmploymentCivil / Building / E&M£100-130,000
- MacclesfieldPermanent EmploymentCivil / Building / E&M£95,000
- LondonPermanent EmploymentTBC
- LondonPermanent EmploymentCivil / Building / E&M£120,000
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |
Resources
Papers, standards and tools
No resources yet
Summaries of papers, standards and tools are added by editors and appear here once published.