M2.1 Planning & Schedule Development

By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, over what durations and calendars, through which interfaces and milestones, and with enough detail to support later logic analysis, resource assessment, progress updating, forecasting and control.
347 knowledge pages16,283 discussions1 blogs202 normsRead M2.1 in the Open Standard text

Knowledge

Articles and chapters

  • M2.3 — Resources, Productivity & Schedule Optimisation

    By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.

    21 Oct 2026
  • M2.2 — Logic, Critical Path & Float

    The learner should be able to construct and analyse a logically linked schedule, choose relationships, recognise missing or inappropriate logic, distinguish logic from constraints, identify critical and near-critical paths, understand total and free float, recognise negative or unusually high float.

    21 Oct 2026
  • M2.1 — Planning & Schedule Development

    By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, and over what durations and calendars etc.

    21 Oct 2026
  • M1.5 — Data Quality, Integration & Traceability

    By the end of this section, the learner should be able to establish and operate a project-controls data environment in which important information is complete enough, accurate enough, timely enough, consistent enough and traceable enough to support management decisions.

    21 Oct 2026
  • M1.4 — Progress Measurement

    By the end of this section, the learner should be able to design, apply and challenge progress-measurement rules that convert evidence of completed work into a credible statement of physical accomplishment. They should be able to choose an appropriate measurement method.

    21 Oct 2026
  • M1.3 — Integrated Baselines

    By the end of this section, the practitioner should be able to establish, test and explain an integrated project baseline that brings authorised scope, schedule, budget, assumptions, progress rules and accountability into one coherent reference position.

    21 Oct 2026
  • M1.2 — Coding & Control Structures

    By the end of this section, the practitioner should be able to design and apply a coherent set of coding and control structures that allows project information to be organised, integrated, aggregated, reconciled and reported without repeatedly rebuilding the underlying data.

    21 Oct 2026
  • M1.1 — Scope & Work Breakdown Structures

    By the end of this section, the practitioner should be able to take an authorised project scope and turn it into a Work Breakdown Structure.

    21 Oct 2026
  • Project Controls Open Standard

    Collaborative work-in-progress contributed by members and experts from across the community cadre.The Project Controls Open Standard brings together practical project controls knowledge in one free,…

    21 Oct 2026
  • M6 — Governance & Change

    Module 6 establishes the essential practices for directing, controlling and maintaining accountability throughout the project lifecycle. It explains how to establish effective governance arrangements, define decision-making authorities and responsibilities, and manage changes to approved scope, schedule, cost and risk through integrated change control. It also covers how to maintain configuration and baseline integrity, apply proportionate assurance and independent challenge, and ensure that management decisions are supported by reliable evidence. Finally, it explains how to communicate governance information, record decisions and manage actions through to completion. Together, these practices provide a structured and transparent foundation for maintaining project control, ensuring accountability, managing change, identifying weaknesses and supporting timely, evidence-based decisions to improve delivery outcomes.

    21 Oct 2026

Discussions

16,275 discussions

  1. 14replies
    Create a summary duration without scheduling tasks???
    Planning, Scheduling & Programming Discussionby Brian Hennessy· 7 years ago
  2. 14replies
    S curve Formula
    Planning, Scheduling & Programming Discussionby Bryc Ali· 7 years ago
  3. 14replies
    Budgeted Total Cost Data Lost when Imported
    Oracle Primavera - PM6by Eric Preisendanz· 7 years ago
  4. 14replies
    Line of balance
    Planning, Scheduling & Programming Discussionby Andrew Grain· 7 years ago
  5. 14replies
    MS Project File Bloat
    Microsoft Projectby Geoff Holt· 8 years ago
  6. 14replies
    Project management
    Planning, Scheduling & Programming Discussionby Muhammad Ahmad· 8 years ago
  7. 14replies
    Concurrent Delays in the Schedule
    Planning & Programming Trainingby Dimple Dean· 8 years ago
  8. 14replies
    Calculate remaining units per time from crew sizes
    Oracle Primavera - PM6by Dennis Hanks· 9 years ago
  9. 14replies
    Import Dates from excel to P6
    Oracle Primavera - PM6by Ferdinand Ancheta· 9 years ago
  10. 14replies
    Planning/Programming Books
    Planning & Programming Trainingby James Young· 10 years ago

701–710 of 16,275

Blogs

Thought leadership

  • How Project Planners Should Deal with a Difficult Client PMO

    Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…

    Sunchana Johnston

    17 Oct 2026
  • PROCEDURES No 16 – Quality Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    23 Aug 2026
  • Sunchana’s P6 Lancelot Meets OPC Star Wars

    Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…

    Sunchana Johnston

    10 Aug 2026
  • PROCEDURES No 15 – Planning Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    10 Aug 2026
  • PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    20 Jul 2026
  • Programme Planning Standards: The Rules of the Game

    Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…

    Sunchana Johnston

    5 Jul 2026

Jobs

Roles asking for this

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent Employment
    TBC
  4. LondonPermanent EmploymentCivil / Building / E&M
    £120,000

Norms & Rates

Rates, norms and durations

ActivityEntry (verbatim)
005 Initiate Phase
010 Analyse Phase
015 Design Phase
020 Develop Phase
025 Test Phase
030 Implement Phase
035 Support Phase
Aluminium RoofingAluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day