M2.1 Planning & Schedule Development
Knowledge
Articles and chapters
- M6.5 — Claims & Forensic Analysis22 Oct 2026
By the end of this section, the practitioner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…
- M6.3 — Baseline Change & Configuration Control22 Oct 2026
By the end of this section, the practitioner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…
- M6.2 — Change Control22 Oct 2026
By the end of this section, the practitioner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement…
- M6.1 — Project Controls Strategy & Governance22 Oct 2026
By the end of this section, the practitioner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation…
- M5.4 — Integrated Forecasting & Predictive Analysis22 Oct 2026
By the end of this section, the practitioner should be able to produce one coherent view of expected project outcomes by reconciling schedule, cost, physical accomplishment, acceptance, commercial exposure and uncertainty. They should identify inconsistent assumptions, distinguish target from forecast, build…
- M5.3 — Integrated Cost & Schedule Performance22 Oct 2026
By the end of this section, the practitioner should be able to connect authorised scope, time-phased budget, evidence of accomplishment and incurred cost at a common cut-off. They should calculate and interpret basic Earned Value Management measures, reconcile them to source records, distinguish cost efficiency…
- M5.2 — Variance & Trend Analysis22 Oct 2026
By the end of this section, the practitioner should be able to establish a valid comparison, calculate period and cumulative variance, analyse a time series, distinguish delivery deterioration from timing or data effects, find causes across discipline boundaries and test whether an intervention improves the…
- M4.5 — Contingency & Uncertainty22 Oct 2026
By the end of this section, the practitioner should be able to establish, explain, govern and reassess cost and schedule provision for uncertainty without hiding it inside the base plan. They should be able to distinguish base budget or duration from contingency.
- M4.4 — Risk Response & Control22 Oct 2026
By the end of this section, the practitioner should be able to turn an analysed threat or opportunity into a controlled management response that is proportionate, owned, time-bound and integrated with the way the project is actually delivered.
- M4.3 — Quantitative Risk Analysis22 Oct 2026
By the end of this section, the practitioner should be able to take a defined project objective, a credible current schedule or cost model, and a selected set of material uncertainties and turn them into a transparent quantitative view of possible outcomes.
Discussions
16,276 discussions
- 4repliesImporting excel dates- changing the 00:00 to 17:00Oracle Primavera - PM6by John Reeves· 6 years ago
- 4repliesHow do you get around the required (changing)WBS import export requirement/issue?Oracle Primavera - PM6by John Reeves· 6 years ago
- 4repliesUrgent : Delay DaysOracle Primavera - PM6by Vrinda M· 6 years ago
- 4repliesForecast SchedulePlanning, Scheduling & Programming Discussionby Smoke Manibo· 6 years ago
- 4repliesPrimavera TrainingOracle Primavera - PM6by Shamim Asadi· 6 years ago
- 4repliesProject Scheduler - Uploading of Actuals Costs into PS8Sciformaby Calvin Raju· 6 years ago
- 4repliesPrimavera Job Services ORA01017: invalid username/password; logon deniedOracle Primavera - PM6by Emad Mofarej,PMP,PSP,CDT,CCM· 6 years ago
- 4repliesMissing project codes - feels like deja vuOracle Primavera - PM6by John Reeves· 6 years ago
- 4repliesDisplay '%' Sign/Symbol in User Define FiledOracle Primavera - PM6by Nilesh Jain· 6 years ago
- 4repliesTransfer Progress between 2 ProgrammesOracle Primavera - PM6by Mike planner· 6 years ago
4,671–4,680 of 16,276
Blogs
Thought leadership
- How Project Planners Should Deal with a Difficult Client PMO17 Oct 2026
Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…
Sunchana Johnston
- PROCEDURES No 16 – Quality Standards23 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Sunchana’s P6 Lancelot Meets OPC Star Wars10 Aug 2026
Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…
Sunchana Johnston
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!20 Jul 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Programme Planning Standards: The Rules of the Game5 Jul 2026
Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…
Sunchana Johnston
Jobs
Roles asking for this
- Planning Planet LondonPermanent EmploymentTBC
- London (EU.UK.LON)Permanent EmploymentCivil / Building / E&M£85,000 + car or allowance (circa £6,500) + excellent staff benefits
- Planning Planet London (EU.UK.LON)Contract EmploymentCivil / Building / E&M£510/day + accommodation allowance
- Planning Planet London (EU.UK.LON)Contract or PermanentRailway£55K or Day Rate
- United Kingdom (EU.UK)Contract or PermanentCivil / Building / E&MSalary: £50,000–£75,000
- United Kingdom (EU.UK)Permanent EmploymentOil / Gas / Power£75,000 – £90,000 + car or allowance (circa £6,500) + staff benefits
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |
Resources
Papers, standards and tools
No resources yet
Summaries of papers, standards and tools are added by editors and appear here once published.