Open Standard · M2 Planning & Scheduling
M2.1 Planning & Schedule Development
Knowledge
Articles and chapters
- M1.5 — Data Quality, Integration & Traceability21 Oct 2026
By the end of this section, the learner should be able to establish and operate a project-controls data environment in which important information is complete enough, accurate enough, timely enough, consistent enough and traceable enough to support management decisions.
- M1.4 — Progress Measurement21 Oct 2026
By the end of this section, the learner should be able to design, apply and challenge progress-measurement rules that convert evidence of completed work into a credible statement of physical accomplishment. They should be able to choose an appropriate measurement method.
- M1.3 — Integrated Baselines21 Oct 2026
By the end of this section, the practitioner should be able to establish, test and explain an integrated project baseline that brings authorised scope, schedule, budget, assumptions, progress rules and accountability into one coherent reference position.
- M1.2 — Coding & Control Structures21 Oct 2026
By the end of this section, the practitioner should be able to design and apply a coherent set of coding and control structures that allows project information to be organised, integrated, aggregated, reconciled and reported without repeatedly rebuilding the underlying data.
- M1.1 — Scope & Work Breakdown Structures21 Oct 2026
By the end of this section, the practitioner should be able to take an authorised project scope and turn it into a Work Breakdown Structure.
- Project Controls Open Standard21 Oct 2026
Collaborative work-in-progress contributed by members and experts from across the community cadre.The Project Controls Open Standard brings together practical project controls knowledge in one free,…
- M6 — Governance & Change21 Oct 2026
Module 6 establishes the essential practices for directing, controlling and maintaining accountability throughout the project lifecycle. It explains how to establish effective governance arrangements, define decision-making authorities and responsibilities, and manage changes to approved scope, schedule, cost and risk through integrated change control. It also covers how to maintain configuration and baseline integrity, apply proportionate assurance and independent challenge, and ensure that management decisions are supported by reliable evidence. Finally, it explains how to communicate governance information, record decisions and manage actions through to completion. Together, these practices provide a structured and transparent foundation for maintaining project control, ensuring accountability, managing change, identifying weaknesses and supporting timely, evidence-based decisions to improve delivery outcomes.
- M5 — Performance Management & Reporting21 Oct 2026
Module 5 establishes the essential practices for measuring, analysing, forecasting and communicating project performance. It explains how to develop meaningful performance measures across scope, schedule, cost, progress, risk and resources, and apply techniques such as Earned Value Management to assess delivery against approved baselines. It also covers how to identify and explain variances, analyse trends and root causes, develop credible forecasts, and determine effective corrective actions. Finally, it explains how to turn reliable project data into clear, consistent and decision-focused management information. Together, these practices provide a structured foundation for understanding project performance, identifying emerging issues, anticipating future outcomes and supporting timely, evidence-based decisions to improve delivery throughout the project lifecycle.
- M4 — Risk & Uncertainty21 Oct 2026
Module 4 establishes the essential practices for identifying, assessing, managing and responding to project risks and opportunities throughout the project lifecycle. It explains how to establish a structured risk management framework, evaluate and prioritise uncertainties using qualitative and quantitative analysis, and understand their potential impact on project cost, schedule and delivery outcomes. It also covers how to develop effective risk responses, assign ownership, integrate mitigation actions into project plans, and determine appropriate levels of contingency and confidence. Together, these practices provide a consistent and proactive foundation for managing uncertainty, anticipating potential threats and opportunities, improving forecast confidence and supporting informed, risk-based decisions to protect project objectives and delivery performance.
- M3 — Cost & Estimating21 Oct 2026
Module 3 establishes the essential practices for estimating, budgeting, forecasting and controlling project costs. It explains how to translate project scope into credible cost estimates using appropriate methods, document the underlying assumptions and uncertainties, and establish authorised budgets aligned with the project schedule and delivery strategy. It also covers how to monitor actual expenditure, commitments and emerging changes, develop reliable forecasts of the likely final cost, and identify and analyse cost variances and trends. Together, these practices provide a consistent and transparent foundation for managing project expenditure, understanding cost performance, anticipating financial pressures and supporting informed decisions to maintain affordability and cost control throughout the project lifecycle.
Discussions
16,275 discussions
- 10repliesReporting from many projects from the EPSOracle Primavera - PM6by Brian Walkin· 4 years ago
- 10repliesIssue with future stored period performance - one for the tech heads!Oracle Primavera - PM6by John Sims· 4 years ago
- 10repliesP6 - For Financial MonitoringOracle Primavera - PM6by Suhaila Tsu· 4 years ago
- 10repliesMost Important Issue In Scheduling: ContingencyOracle Primavera - PM6by John Reeves· 5 years ago
- 10repliesActivity Layout / Website Timescale IssuePlanning, Scheduling & Programming Discussionby Troon Sigma· 5 years ago
- 10repliesEvent InterceptedOracle Primavera - PM6by Arnel Lagumbay· 5 years ago
- 10repliesOnline Training Courses for Project PlanningPlanning, Scheduling & Programming Discussionby Ali Vessali· 6 years ago
- 10repliesBest (REMOTE) way to get updates from many people for a schedule (broad question)Oracle Primavera - PM6by John Reeves· 6 years ago
- 10repliesText Annotations on Bar ChartAsta Powerprojectby Darren Gregg· 6 years ago
- 10repliesBaseline date governing successor activity date after removing the baselinePlanning, Scheduling & Programming Discussionby Shree Abdullah· 6 years ago
1,261–1,270 of 16,275
Blogs
Thought leadership
- How Project Planners Should Deal with a Difficult Client PMO17 Oct 2026
Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…
Sunchana Johnston
- PROCEDURES No 16 – Quality Standards23 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Sunchana’s P6 Lancelot Meets OPC Star Wars10 Aug 2026
Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…
Sunchana Johnston
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!20 Jul 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Programme Planning Standards: The Rules of the Game5 Jul 2026
Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…
Sunchana Johnston
Jobs
Roles asking for this
- ManchesterPermanent EmploymentCivil / Building / E&M£100-130,000
- MacclesfieldPermanent EmploymentCivil / Building / E&M£95,000
- LondonPermanent EmploymentTBC
- LondonPermanent EmploymentCivil / Building / E&M£120,000
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |
Resources
Papers, standards and tools
No resources yet
Summaries of papers, standards and tools are added by editors and appear here once published.