Rates, Norms & Durations
Bituminous Waterproofing
In the Open Standard
Started by Technical Development ·
- Last updated
- Updated
- Views
- 11 views
This page is part of the Rates, Norms & Durations library.
Open the norms tables →Brush applied coatings (tretol etc) to prepared concrete surfaces.
- A two coat application = 5.0 m2/hr
- A three coat application = 3.5 m2/hr
Sheet materials (bituthene etc) fixed to prepared concrete surfaces.
- Horizontal Surfaces = 4.0 m2/hr
- Vertical Surfaces = 3.5 m2/hr
Comments
No comments yet.
Log in or join to comment