Rates, Norms & Durations
P.V.C. Sheeting
In the Open Standard
P.V.C. Sheeting Usually carried out with a minimum of a 3 man gang with a labourer. Large Roof Areas = 50 m2/day Smaller Areas = 40 m2/day
Started by admin ·
- Last updated
- Updated
- Views
- 9 views
This page is part of the Rates, Norms & Durations library.
Open the norms tables →P.V.C. Sheeting
Usually carried out with a minimum of a 3 man gang with a labourer.
Large Roof Areas = 50 m2/day
Smaller Areas = 40 m2/day
Comments
No comments yet.
Log in or join to comment