Rates, Norms & Durations
Mini Piling
In the Open Standard
Mini Pile Construction Small diameter piles quickly driven into position, with suitable concrete pile cap.
Started by admin ·
- Last updated
- Updated
- Views
- 7 views
This page is part of the Rates, Norms & Durations library.
Open the norms tables →Mini Pile Construction
Small diameter piles quickly driven into position, with suitable concrete pile cap.
| Diameter | Depth | Hrs per pile | m/hr depth |
| 235 mm | 35 m | 40 hrs/no | 0.87 m/hr |
Comments
No comments yet.
Log in or join to comment